HX
HabiXel LTD D2PM Platform v2.0

Design-to-Procurement-and-Manufacturing Operating System (ISO 1,200mm Grid • 32-SKU Golden Balance)

Project Library:
Open Tabs (2/4 Max):
Current Project: Konza Technopolis (1,008 Units) |
Active Project Workflow Konza Technopolis (1,008 Units)
1.1

Section 1.1 — Project Documents, Planning Brief & Public Data Sources

AI Ingestion Engine

Upload planning documents, paste your project brief, and configure public regulatory data sources to auto-populate Vectors A–E.

Next: Section 1.2 (Core Parameters & Vectors) ↓
DOCUMENTS Upload Planning & Design Documents (Optional)
.PDF, .DOCX, .TXT, .CSV, .DXF
Select Files or drop here

Multiple files supported

Uploaded Project Documents (0)
PROMPT / BRIEF Paste Brief / AI Instructions (Works with or without uploaded files)
PUBLIC SOURCES (KONZA / NAIROBI, KENYA): 4 Active / 0 Excluded
Automatically extracts constraints from all provided documents, text, and active public sources.
1.2

Section 1.2 — Core Project Definition & Engineering Vectors (A–E)

Single Source of Truth

Edit foundational project scale in the Core Bar below, or fine-tune specialized settings across Vectors A–E.

CORE PROJECT SCALE & IDENTITY Supports up to 25,000 Units & 200 Hectares (2,000,000 m²)
Gross Land Area (m²) ? 6.50 ha
Target Residential Units ? 1,008 Units

Vector A: Geospatial & Geotechnical Site Parameters

Governs earthworks, seismic reinforcement, and Substructure Template (`FND-01`, `FND-02`, or `FND-04` + `FND-03` Jig)

Vector A
Net Buildable Site Efficiency ? 82%

Feasibility Locked: 1,008 Units Validated on 1,200mm ISO Grid

76% of Legal Envelope Used

All residential blocks and community buildings fit within statutory setbacks, BAR, and FAR.

1.3

Section 1.3 — Generative Master Plan Scenarios & ISO 1,200mm Grid Preview

Select Option A, B, or C to lock your baseline outline design before entering Stage 2 (3D Mixed-Typology Massing).

Option A: Max Yield High Density

Maximizes residential unit yield up to the statutory FAR ceiling.

Total Units1,320
Structures168
D2PM Cost$51.2M
Schedule17 Mos
Option B: Balanced Target Recommended

Matches your exact commercial brief while minimizing earthworks & crane moves.

Total Units1,008
Structures156
D2PM Cost$39.4M
Schedule15 Mos
Option C: Eco & Low-CAPEX Max Green/Solar

Prioritizes courtyard parkland, passive solar orientation, and lower floor heights.

Total Units860
Structures134
D2PM Cost$33.6M
Schedule13 Mos
G+6 Mid-Rise G+4 Walk-Up Semi-Detached (G+1) Detached Villas (G+1)
1,200mm ISO Grid Locked • FND-03 Laser Anchor Jigs